紧固件扭矩(力矩)-扭矩与扭矩扳手-手柄加长是否影响力矩??-开口销孔对齐
Torque and Torque Wrenches 扭矩与扭矩扳手As the speed of an aircraft increases, each structural member becomes more highly stressed. It is therefore extremely important that each m...
SECTION IV – REPAIR 9-零件重新喷涂-零件搪瓷漆修复和环氧漆修复
A.Method No. 409A: Enamel Paint Repair of PartsMethod No. 409A:零件搪瓷漆修复Repair painted surfaces of parts as follows:按以下步骤修复零件涂漆表面:(1) Prepare surfaces to be pain...
半径规的使用方法(R规)
半径规,也称为R规或圆弧规(以下简称为R规),是一种用于测量和检查工件内、外圆弧半径的工具。R规(半径规) 01 R规的结构样式 用于检查圆弧角半径尺寸是否合格的半径样板叫做R规。R规...
SECTION IV – REPAIR 7-更换钢丝螺套、螺柱、衬套、销钉和螺母板-B.Method No.407B:更换松动或损坏的螺纹钢丝螺套(铝或镁零件)
7.Replacing Inserts, Studs, Bushings, Pins and Nutplates更换钢丝螺套、螺柱、衬套、销钉和螺母板B.Method No. 407B: Loose or Damaged Thread Inserts (Aluminum or Magnesium Parts) Repla...
SECTION IV – REPAIR 8-齿轮齿修复-A.Method No. 408A:齿轮齿渐开线表面轻微损伤修复
8. Repairing Gear Teeth齿轮齿修复A.Method No. 408A: Minor Gear Teeth Involute Surface Damage RepairMethod No. 408A:齿轮齿渐开线表面轻微损伤修复Repair minor surface damage on gear t...
A320-30防冰防雨【系统原理】
A320-Single Aisle-TECHNICAL TRAINING MANUAL-T1 (CFM 56) (Lvl 2&3)ICE & RAIN PROTECTION-30章 防冰和防雨系统ICE & RAIN PROTECTIONGENERALIce and Rain Protection System Com...
6777A020001 HIGH PRESSURE VALVE
高压活门一、名称HIGH PRESSURE VALVE高压活门二、件号6777A020001三、章节号36-10-20四、适用机型ARJ21五、系统36-气源系统六、安装位置发动机短舱区域七、部件原理高压活门(PN:6777A020001)...
SECTION IV – REPAIR 6 -修理镁零件-B.Method No. 406B:镁合金零件严重损坏修复
6.Repairing Magnesium Parts修理镁零件B.Method No. 406B: Magnesium-Alloy Parts Heavy Damage RepairMethod No. 406B:镁合金零件严重损坏修复Repair minor damage to magnesium-alloy parts ...
SOPM20-10-02合金钢的机械加工和应力消除
合金钢的机械加工和应力消除MACHINING OF ALLOY STEEL AND STRESS RELIEVING STEEL 1. INTRODUCTION 介绍 A.The data in this subject comes from Boeing Process Specifications BAC5436, B...
SECTION IV – REPAIR 7-更换钢丝螺套、螺柱、衬套、销钉和螺母板-J.Method No. 407J: 松动、磨损或损坏的螺母板(焊接式)更换
7.Replacing Inserts, Studs, Bushings, Pins and Nutplates更换钢丝螺套、螺柱、衬套、销钉和螺母板 J.Method No. 407J: Loose, Worn or Damaged Nutplate (Welded) ReplacementMethod No. 40...
SECTION IV – REPAIR 7-更换钢丝螺套、螺柱、衬套、销钉和螺母板-I.Method No. 407I:松动、磨损或损坏的螺母板(铆接式)更换
7.Replacing Inserts, Studs, Bushings, Pins and Nutplates更换钢丝螺套、螺柱、衬套、销钉和螺母板I.Method No. 407I: Loose, Worn or Damaged Nutplate (Riveted) ReplacementMethod No. 407...
SECTION IV – REPAIR 7-更换钢丝螺套、螺柱、衬套、销钉和螺母板-H.Method No. 407H:松动、磨损或损坏的 Rosan螺柱和钢丝螺套的更换
7.Replacing Inserts, Studs, Bushings, Pins and Nutplates更换钢丝螺套、螺柱、衬套、销钉和螺母板H.Method No. 407H: Loose, Worn, or Damaged Rosan Stud and Insert ReplacementMethod No....
SECTION IV – REPAIR 7-更换钢丝螺套、螺柱、衬套、销钉和螺母板-C.Method No. 407C:松动或损坏的Keensert螺柱修复
7.Replacing Inserts, Studs, Bushings, Pins and Nutplates更换钢丝螺套、螺柱、衬套、销钉和螺母板C.Method No. 407C: Loose or Damaged Keensert Stud RepairMethod No. 407C:松动或损坏的Ke...
SECTION IV – REPAIR 7-更换钢丝螺套、螺柱、衬套、销钉和螺母板-A.Method No. 407A:松动或损坏螺纹钢丝螺套更换
7.Replacing Inserts, Studs, Bushings, Pins and Nutplates更换钢丝螺套、螺柱、衬套、销钉和螺母板 NOTE: Refer to Method No. 415A, and 415B for repairing damaged/oversized diameters w...
航空开关知识和相关术语,switch,Microswitches,Relays
Switches 开关Switches control the current flow in most aircraft electrical circuits. A switch is used to start, to stop, or to change the direction of the current flow in the circu...
飞机维修工程管理-适航限制项目(AWL)
适航限制项目(AWL)背景及定义:CCAR/FAR 25.571 结构的损伤容限和疲劳评定中要求,(3) 根据本条要求的评定,必须制订为预防灾难性破坏所必须的检查工作或其它程序,并必须将其载入第25.1529条...
飞机维修工程管理-审定维修要求(CMR)
审定维修要求(CMR)背景及定义:按照CCAR/FAR 25.1309要求,对运输类飞机的系统进行安全性分析和评估时,提出了故障探测要求,以防止危险性和灾难性故障发生。对这些要求经过进一步评审,被确...























