分类
子分类
排序
SOPM20-50-17液压组件的防腐蚀处理程序
液压组件的防腐蚀处理程序CORROSION PROTECTION PROCEDURES FOR HYDRAULIC COMPONENTS 1. INTRODUCTION 介绍 A. The data in this subject comes from Boeing Process Specification Control Dr...
SOPM20-11-08如何编程可编程电路设备
如何编程可编程电路设备HOW TO PROGRAM PROGRAMMABLE CIRCUIT DEVICES 1. INTRODUCTION 介绍 A. The data in this subject gives general procedures to put programs into Boeing-supplied pro...
SOPM20-30-94应用防雨侵蚀涂料前进行最终清洗的溶剂(94系列)
应用防雨侵蚀涂料前进行最终清洗的溶剂(94系列)SOLVENTS FOR FINAL CLEANING BEFORE APPLICATION OF RAIN EROSION RESISTANT COATINGS (SERIES 94) 1. GENERAL 通用 A. Thissubject contai...
SECTION IV – REPAIR 13-电气元件修理
13.Repairing Electrical Components 电气元件修理 NOTE: The following methods are typical only. Refer to applicable manual for unit in work for specific instructions. 注:以下方法仅...
SECTION IV – REPAIR 17-密封件修理(硅橡胶)
17. Repairing Seals (Silicone Rubber) 密封件(硅橡胶)修理 A. Method No. 417A: Repair of Disbonded Seals (Silicone Rubber)Method No.417A:脱胶密封件修理(硅橡胶) (1) Remove damage...
HOEYWELL INTRODUCTION 介绍
INTRODUCTION介绍 1. General 通用 Information provided in this manual pertains to overhaul and repair processing for parts manufactured by Honeywell Inc., Phoenix, Arizona. 本手册提...
SOPM20-11-10更换球栅阵列(BGA)零件
更换球栅阵列(BGA)零件REPLACEMENT OF BALL GRID ARRAY (BGA) PARTS 1. INTRODUCTION 介绍 A. The data in this subject comes from Boeing Document D906-00016. 本主题中的数据来自波音文件...
SECTION III – INSPECTION 1. Standard Inspection Practices -L.压降检查:清洁的金属滤芯
L.Pressure Drop Check: Cleaned Metallic Filter Elements压降检查:清洁的金属滤芯Check pressure drop of cleaned filter element as follows:检查清洁后的滤芯压降,方法如下:NOTE: Check ...
SECTION IV – ASSEMBLY 1-通用组装程序
1. General Assembly Practices 通用组装程序A. Protecting Unit During Assembly组装过程中的部件防护Maintain fits and clearances as specified in applicable manual for unit in work. Exe...
SECTION IV – REPAIR 3. 防护涂料及电镀的修复与应用-M.Method No. 403M:修复因底漆和面漆损坏而暴露裸露铝的油漆涂层-环氧胺体系
3. Repair and Application of Protective Coatings and Plating 防护涂料及电镀的修复与应用M.Method No. 403M: Repair of Paint Coatings Damaged Through Primer and Paint Topcoat, Exposin...
SECTION IV – REPAIR 7-更换钢丝螺套、螺柱、衬套、销钉和螺母板-B.Method No.407B:更换松动或损坏的螺纹钢丝螺套(铝或镁零件)
7.Replacing Inserts, Studs, Bushings, Pins and Nutplates更换钢丝螺套、螺柱、衬套、销钉和螺母板B.Method No. 407B: Loose or Damaged Thread Inserts (Aluminum or Magnesium Parts) Repla...
SECTION III – INSPECTION 1. Standard Inspection Practices -E. 轴承检查
E. Bearing Inspection轴承检查(1) Separable Bearings:可分解的轴承。Table 301. Separable Bearing Defect Definitions表301 可分解轴承缺陷的定义Term项目Definition (Description of Defect...
SECTION III – INSPECTION 1. Standard Inspection Practices -K.过滤器气泡点检查
K.Bubble Point Check for Filters过滤器气泡点检查(1) Perform bubble point test on filter in accordance with MIL-F-5504B.根据MIL-F-5504B对过滤器进行气泡点测试。(a) The largest pore s...
SECTION IV – ASSEMBLY 2-密封与密封件
2.Packing and Seals密封与密封件A.Lubricating and Installing Packings密封润滑与安装Refer to Table 501 when selecting the type of packing lubricant and Figure 501 for a graphic rep...
SECTION IV – REPAIR 7-更换钢丝螺套、螺柱、衬套、销钉和螺母板-I.Method No. 407I:松动、磨损或损坏的螺母板(铆接式)更换
7.Replacing Inserts, Studs, Bushings, Pins and Nutplates更换钢丝螺套、螺柱、衬套、销钉和螺母板I.Method No. 407I: Loose, Worn or Damaged Nutplate (Riveted) ReplacementMethod No. 407...
SOPM20-50-16压接钢索的组装
压接钢索的组装ASSEMBLY OF SWAGED CABLES 1. INTRODUCTION 介绍 A. The data in this subject comes from Boeing Process Specification BAC5002. Access to the Boeing Process Specification...
SECTION III – INSPECTION 1. Standard Inspection Practices -G. 目视检查
G. Visual Inspection目视检查(1) General Information通用信息(a) Visual inspection involves viewing the part for general appearance in an effort to locate conditions, which cause or ...





















